Custom Soccer Player Backpack with Ventilated Boot Compartment

Order custom soccer player backpacks with ventilated boot compartments and club logos. MOQ 10, from $15 with shipping, bulk slab prices and 7-day lead time.

Custom Soccer Player Backpack with Ventilated Boot Compartment

Premium custom soccer player backpack with a ventilated football boot compartment, large team storage, padded breathable back support, dual bottle pockets and integrated Sky Zone Impex branding. Five separate 3D product views present the exact navy, turquoise and coral-red design for football clubs, academies, schools, retailers and private-label buyers.

Order details

Minimum order: 10 bags.

Production lead time: 7 days

Specifications

fit
Adjustable padded shoulder straps with breathable ergonomic back support
care
Wipe clean with a damp cloth and air dry naturally
weight
Custom capacity and dimensions available for youth and adult teams
material
Water-resistant ripstop polyester, breathable mesh padding, reinforced base and heavy-duty zipper construction

Customization: Custom bag style and panel design, Sublimation patterns, Club or academy colours, Embroidered or printed team logo, Player name and number, Sponsor artwork, Custom zipper pulls, Woven labels and private labels, Hangtags and branded polybags, Export carton marks

What is the MOQ for this custom soccer backpack?

The minimum order quantity is 10 bags per approved design. Mixed player details can be discussed before artwork approval.

Does the $15 soccer backpack price include shipping?

Yes. The 10-24 bag slab is listed at $15 per bag with shipping included, subject to final delivery destination, dimensions and approved order specifications.

Can we add our football club logo and colours?

Yes. Club crests, academy logos, custom colours, sublimation patterns, names, numbers, labels and packaging can be customized.

Does the backpack have separate boot storage?

Yes. The reinforced lower compartment is ventilated and designed to keep football boots separate from the main uniform and equipment storage.

How long does production take?

The estimated production lead time is approximately 7 days after the artwork, specifications and order details are approved.

Request a quote · Browse products